Napa Pipe Supplemental Draft EIR Volume I and Appendices

WE ARE NAPA COUNTY

Planning DivisionZoning & Land Use Permits

Autumn in Napa

 

About Us

Planning

Building

Conservation

Engineering

Environmental Health

Code Compliance

 

Napa Pipe Supplemental Draft EIR  NPPWebHeader

The Supplemental Draft Environmental Impact Report for the proposed Napa Pipe project was released for comments on Feb. 14, 2011. All comments are due by March 31, 2011.

Mail: Sean Trippi, 1195 Third Street, Suite 210, Napa, CA 94559.

E-mail: napapipe@countyofnapa.org

Go to the Napa Pipe project page

Attend one of the public hearings on the Supplemental Draft EIR

Wednesday, March 16, 2011, 9 a.m.

Wednesday, March 16, 2011, 6 p.m.

Supplemental Draft EIR Volume 1

Cover

Table of Content

Introduction

Report Summary

Project Description

Environmental Evaluation

Water Supply

Recycled Water Pipeline

School Site

Remedial Design and Implementation Plan

Revisions To The Site Plan

Air Quality and Greenhouse Gas Emissions

Alternatives

CEQA Required

Report Preparation

 Napa Pipe Supplemental Draft EIR Volume 2 - Appendices 

Appendix B – Comprehensive Development Application

Appendix E - Traffic and Circulation

Appendix G - Greenhouse Gases

Appendix H - Hazards and Hazardous Materials

Appendix I - Hydrology and Water Quality

Appendix J - Cultural Resources

Appendix K - Biological Resources

Appendix L - Harrison Property