650 Imperial Way Building Window Replacement and Exterior Painting Project, PW 13-04

WE ARE NAPA COUNTY

Public WorksConstruction and Design Engineering

Construction Design

650 Imperial Way Building Window Replacement and Exterior Painting Project, PW 13-04

Status: Complete
Contact: German Sierra
Publish Date: 2013-01-09


This projects work generally consists of, but is not limited to all labor and material for:

The washing, priming, caulking and painting of all exterior walls, window frames (exterior and interior), and exterior handrails of the building.

Removing and replacing approximately 140 exterior single pane windows with new double pane Low-E3 Glass, energy efficient, Argon gas filled window units.

Removing and replacing approximately 63 exterior double pane windows with new double pane Low-E3 Glass, energy efficient, Argon gas filled window units.

Removing and replacing 3 offset pivot entrance doors and insulated glass units.

The building will remain open for regular business during construction.

Contractor shall possess a B license at the time of the contract award.  Engineer's estimate: $203,000. The bid opening date was changed to April 24 at 1:00 P.M. No bids were accepted after that time.  The Board awarded the contract to Home Tech Remodeling Inc on Tuesday, May 13, 2014.  The project is now complete.  Print, view, or download the Notice of Completion